8 days left...what you got left to do ????

The place to socialise, and relax, if it doesn't fit into anything below it fits here, so tell us that joke, or share that story of your last off-road escapade, but remember new comers the virtual drinks are on you!
the fool
Got muddy boots
Got muddy boots
Posts: 77
Joined: Sat Aug 01, 2009 7:37 am
Location: near bath

Re: 8 days left...what you got left to do ????

Post by the fool » Sun Oct 25, 2009 3:55 pm

its funny really when you have your head under the bonnet you would think my engine is sweet then you look up and you see the smoke
got lights working and fixed exhaust think im about ready to go
phill

User avatar
Henry
Suzuki Guru
Suzuki Guru
Posts: 1219
Joined: Wed Apr 01, 2009 6:08 pm

Re: 8 days left...what you got left to do ????

Post by Henry » Sun Oct 25, 2009 4:46 pm

dan wrote:hah! with the amount of smoke pouring out I think I'd cause a few accidents on the m4, visability down to about 3 feet!

Bring it, you will be surprised what they can withstand.

A m8 of mine, who some may know put 5L of engine oil in his 1300, was knocking, smoking but still drove it another 2K and even when he took it out it still ran!

User avatar
w1ldstar
Got muddy boots
Got muddy boots
Posts: 95
Joined: Fri Oct 02, 2009 7:58 pm
Location: Upper Wick, Nr Worcester

Re: 8 days left...what you got left to do ????

Post by w1ldstar » Mon Oct 26, 2009 7:52 am

All i have to do it fit 3 seats in and weld up a hole if i get time, so not much to do really 8-)
Suzuki Vitara - 1.5" Suspension lift, Bits4Vits Recovery Bar, Roof rails, Steel front diff.
Drives Shafts broke to date: N/S = 1 - O/S = 0

User avatar
ScottieJ
The Boss
The Boss
Posts: 11618
Joined: Tue Apr 15, 2008 12:13 pm
Location: Chippenham, wiltshire

Re: 8 days left...what you got left to do ????

Post by ScottieJ » Wed Oct 28, 2009 9:47 am

scottiej410 wrote:
scottiej410 wrote:eeeerrrrmmmmmmmmmm :roll: :roll:

Battery mount done
Finish my transmission tunnel coverdone
fit seal round rear door.done
1 more coat of paint.DONE
put seats in DONE
make rear bulkheaddone on a temporary basis
fit lights (all wiring is done though)done
fit roof & backdone
sort out what i'm doing for an air filter as i'm not sure if the original vit one will fit and the top off a 1300 carb stops the choke from working properlydone i cut the centre brace out of the bonnet and it fits now :twisted:
snorkel???
extended transmission breathersDONE
fit roll cagedone
make waffle board & hi lift storage
fit front bumper and wire up spotsDONE
reversing light an essential item for night time offroading IMO DONE

MOT & TAX

I think thats it????
its not as bad as it looks! honest :lol: :lol: i've got a busy weekend ahead of me :lol:

and if i have any time left i will be turning my front bumper into a winch bumper and fitting my winch! I doubt that'll happen though

*edit*
fit bonnet done
fit archesDONE
The list is getting smaller! :mrgreen:
Zuki Build

Steady as she goes!

User avatar
ROBBIE
I spend far too much time on here
I spend far too much time on here
Posts: 4555
Joined: Tue Sep 09, 2008 6:32 pm
Location: Dorset or stuck

Re: 8 days left...what you got left to do ????

Post by ROBBIE » Thu Oct 29, 2009 9:56 am

Get a SWR meter to check my new cb aerial. So was jus wonderin if you got 1 and your goin to compton could i borrow it :mrgreen:
Sid James gone but never forgotten
Jimny 1.6 not as good as an SJ but still good

User avatar
w1ldstar
Got muddy boots
Got muddy boots
Posts: 95
Joined: Fri Oct 02, 2009 7:58 pm
Location: Upper Wick, Nr Worcester

Re: 8 days left...what you got left to do ????

Post by w1ldstar » Thu Oct 29, 2009 6:01 pm

w1ldstar wrote:All i have to do it fit 3 seats in and weld up a hole if i get time, so not much to do really 8-)
Only fitted one seat as really didnt want seats in back :twisted:

Oh fixed fuel leak aswell
Suzuki Vitara - 1.5" Suspension lift, Bits4Vits Recovery Bar, Roof rails, Steel front diff.
Drives Shafts broke to date: N/S = 1 - O/S = 0

Post Reply