So the story begins..
About 6 years ago my step brother bought a Suzuki lt250. Its a 2 stroke manual box and the engine was knackered. The piston had split, knackered the bore ect ect.
The chassis was ok, needed a respray
Seat - needed recovering
Steering - lots of play in the shaft
Brakes - all ok
Suspension - all good, gas shock needed tweeking on the rear and some new bushes needing making for the front.
So this was how he got it, and then he forgot about it.
Saturday afternoon... i was rooting in his workshop for a part for another one of our projects (i will post details up when its done ) and found the frame sitting in primer.
So we started to get back into it. Sprayed the chassis and the suspension components. Washed of all the other major parts (still need to find the rear axle)
I spent a few hours making some bushes for the suspension. Ended up getting a bolt and drilling it down the middle to for a bush...keeping the bloody thing square... what a ball ache
Engine has gone to be rebuilt as we couldnt get our hear around the power valve thing
This is what it should look like..
And what we have done (so far)
Henry
Well it is a Suzuki.
- Tramp
- Suzuki, will you marry me?
- Posts: 2828
- Joined: Fri Jul 25, 2008 10:09 pm
- Location: Rotherham - South Yorkshire
Re: Well it is a Suzuki.
great, I love quads, as i child I asked father christmas to bring me one every year, but he never did.....
My brother-in-law's missus has a bit of laand with some horses, sometimes me and mrs tramp visit them and i get to play on their quad, Its great,
My brother-in-law's missus has a bit of laand with some horses, sometimes me and mrs tramp visit them and i get to play on their quad, Its great,
Re: Well it is a Suzuki.
We have 3 farm quads for work, but nothing like this... its meant to be quick... saying that all our farm quads are limited at 50
Re: Well it is a Suzuki.
This is sort of side lined. We started in the summer, then things happen such as combining bailing silage tractor pulling projects ect, the workshop that is pictured was needed to be used for other things. (the farm has 2 workshops)
So we moved all the stuff into the other workshop, and funnily enough havent been in there since. The plan was to build the panda in this other workshop, but all the welders ect are in the new one, but we will probably transfer the panda into this workshop and sort something out with the quad.
As far as i know we still havent received the engine, will have to go and knock on his door....
So we moved all the stuff into the other workshop, and funnily enough havent been in there since. The plan was to build the panda in this other workshop, but all the welders ect are in the new one, but we will probably transfer the panda into this workshop and sort something out with the quad.
As far as i know we still havent received the engine, will have to go and knock on his door....